Interface Monitoring And Analysis Of Pipeline And Products Marketing Company Limited Enugu Depot
...Making Research more of a fun
Putting smiles in the face of Students
Writing your project with precision
AFRICA'S LARGEST ONLINE
PROJECT ARCHIVES
Search Projects materials, seminars, assignments etc.
Get Professional help. Access 10000+ Works,
Over 300 Software Implementations.
...Get It Done In Record Time
DEPARTMENTS
agricultural education proje ... 0
accounting project topics 669
accounting projects topics & m ... 70
agricultural education project ... 13
agricultural engineering proje ... 33
applied biochemistry projects ... 6
banking and finance project to ... 196
biochemistry project topics an ... 2
biology education project topi ... 12
building technology project to ... 3
business administration projec ... 458
business education project top ... 5
business management project to ... 448
chemical engineering 22
chemical pathology projects to ... 6
chemistry project topics and m ... 17
co-operative and rural develop ... 99
co-operative economic and mana ... 99
computer science project topic ... 351
crop science project topics & ... 1
education project topics and m ... 317
education projects topics and ... 36
electrical and electronic proj ... 54
english language and literatur ... 7
estate management project topi ... 23
fashion design technology proj ... 12
fashion design technology proj ... 10
food science project topics an ... 199
geoinformatics and surveying p ... 4
home economics education proje ... 6
igbo language education projec ... 3
industrial chemistry project t ... 15
industrial chemistry projects ... 29
information technology project ... 2
insurance project topics 63
international relation project ... 26
introductory technology educat ... 1
latest mathematics education p ... 10
library and information scienc ... 2
list of chemistry science educ ... 8
list of computer science educa ... 45
list of economics education pr ... 16
list of english language educa ... 29
list of integrated science edu ... 25
marketing project topics 285
mass communication project top ... 272
mathematics projects topics an ... 1
mba projects topics and materi ... 81
mechanical engineering project ... 128
medical laboratory projects to ... 10
medical radiography and radiol ... 8
microbiology projects topics a ... 104
nursing project topics and mat ... 4
nursing projects topics and ma ... 15
nutrition and dietetics projec ... 22
office technology and manageme ... 128
peace studies and conflict res ... 19
philosophy projects topics and ... 7
physical and health education ... 5
physics options project topics 17
physis education project topic ... 2
physology project topics 3
political science project topi ... 6
printing technology projects t ... 2
projects topics and materials ... 2
purchasing and supply project ... 43
quantity surveying project top ... 1
sociology & psychology project ... 4
sociology and anthropology pro ... 17
statistics project topics and ... 52
thesis topics & materials for ... 11
thesis topics materials for fa ... 0
Select Department
Interface Monitoring And Analysis Of Pipeline And Products Marketing Company Limited Enugu Depot
Get the complete project material now!

User Guide before placing order for complete project topics and materials:

It is important that the researcher knows exactly what he is go to do so that I could be done effectively.Make sure you update any research work you purchased on our website. Do not copy word for word. Using our research is legal. Our aim is to provide project topics and materials for easy access to information and to reduce stress of moving from one book stop or library to another in the name of sourcing for one research textbook or research materials. We do not encourage any form of plagiarism. Our aim is to generate research project ideas for students. The contents of the project material provide will help students to generate new ideals. Every researcher must look around him in his immediate environment and beyond to improve the work. To order the below complete project materials, Make payment deposit or cash transfer into any of the following banks:

GTBANK

Account Name: Chi E-Concept Intl, Account Number: 0115939447

Other payment options

We accept cash deposit, cash transfer and Bitcoin.

Click on download to complete your order.Call or Whatsapp +23408063386834

CLICK HERE TO CHAT WITH OUR CUSTOMER SUPPORT TEAM ON WHATSAPP

INTERFACE MONITORING AND ANALYSIS OF PIPELINE AND PRODUCTS MARKETING COMPANY LIMITED ENUGU DEPOT.

 

ABSTRACT

This research was carried out with the sole aim of monitoring interface in the transportation of petroleum pipeline products and the analysis of this product from Enugu depot.  In the research it was observed that product contaminates each other if interface was not properly monitored and cut at the appropriate time.

The three major products that were considered in this research were premium motor spirit (PMS) automotive gas premium (AGO0 and dual purpose kerosene  (DPK).

The tests carried out point test smoke point test, initial and final boiling point test (Distillation), temperature and density test, to ascertain the standard quality specification and the extent of their purity.

It was observed from the result that the flash point value for DPK and AGO were 430c and 820c respectively.  The average smoke point test values for DPK product was 21.92mm.  the initial  and final boiling point of PMS were350c and 1750c, respectively.   The observed density at the DPK/AGO interface monitoring test were 819 kg/m3 and 850 kg/m3 and corrected densities for DPK and AGO were 830.2kg/m3 and 859.9kg/m3 respectively. The interface reception cut point for DPK/AGO interface  monitoring was made at the corrected density of 849.0 kg/m3.  And the temperature of DPK and AGO were 310c respectively.

The result from the analysis revealed that the boiling point of PMS was far more lower than that of AGI and DPK, which implies that PMS has a higher volatility than the two other products the flash point test revealed that the minimum temperature at which AGO and DPK ignites was 66.50c and 430c PMS was not determined because of its high volatility.  Also, the standard minimum smoke point of DPK was determined to be 22mm.  The smoke point test for AGO and PMS were not carried out because, they were not domestically used and their combustion normally takes value in an engine.

This research has become very necessary because it reveals the proper way pf handling petroleum pipeline product to meet standard specification for domestic and industrial use.

 

CHAPTER ONE

  1. INTRODUCTION

1.1     HISTORICAL PERSPECTIVE

PIPELINE TRANSPORT OPERATION

 

As an instrument of transport, the pipeline is almost as old as the wheel.  Indeed, one of the big problems facing earning civilizations in their development of the first cities was the provision of an effective water supply, and the inventive clines are believed to have used bamboo pipes for this purpose as much as 7,000 year ago.  The Syrians the Egyptians, the Greeks and the Romans all used water mains made of clay or hollow stone, and in 525 B.C.  the king of Persia supplied his desert arm with water by means of a pipeline made of sown oxetride.

The problem of bulk transport of oil arose an soon as the modern international oil industry itself was in Pennsylvania in 1859.  During the early days of the industry the uniform method of moving crude oil or refined products in bulk was by barrels.  These were loaded on to wagons trains or ships like any ordinary merchandise.  However teamsters owning wagons were charging such exorbitant have age was sought.  Pipeline appeared the obvious answer and after some encouraging experiments with wooden pipes the first commercially successful oil pipeline was built in 1865.  this line, 2 in diameter was made of cast iron could handle 250 tones of oil per day.  Its advantages over wagons and barrels for over land transport was instantly appreciated by other petroleum dealers, and very soon many more lines were in service.  steel began replacing cast iron about the year 1910, and a proliferation of pipelines resulted.

 



Get the complete project material now!
CUSTOMER'S REVIEW
blessing
I so much appreciate, keep the good work on.
excellent customer support
I am happy, my project was great.
ohikhueme sylvanus
Please i need theses on Leadership and good governence in nigeria: Imperative of security in nigeria, please i would glad if my message is answered immediatly. Thanks
Tony
This site have all scholars needs for their project, i can testify to that.
Rita
A site with great relief to scholars.
1 - 5 of 96 Reviews
PROJECT INFO

UID : 13445 PRICE : 5,000.00

Download Now
Related Topics
interface monitoring and analysis of pipeline and products marketing company limited enugu depot
the role of publicity in regulation the marketing of petroleum products in the south east of nigeria (a case study of pipeline and products marketing company ppmc, enugu depot enugu)
problems of allocation, distribution and marketing of petrolum products. (a case study of nnpc depot in enugu east local government, enugu state)
problems of allocation, distribution and marketing of petrolum products. (a case study of nnpc depot in enugu east local government, enugu state)
management problems of petroleum products in nigeria (a case study of pipline and product marketing company enugu)
management problems of petroleum products in nigeria (a case study of pipline and product marketing company enugu)
marketing of banking and financial service (a case study of leadway assurance company limited)
the effectiveness of marketing planning and control in a manufacturing organization: a case study of anammco in enugu. marketing of cosmetics products in enugu state
the press in nigerian politics: analysis of issues and patterns of news coverage the effect of economic department depression in the marketing of paint product (a case study of andy group of company)
the press in nigerian politics: analysis of issues and patterns of news coverage the effect of economic department depression in the marketing of paint product (a case study of andy group of company)


Payment Name Phone Number
Email Address Payment Date
Gender Payment method