Design And Implementation Of A Weather Forecasting Package For Aviation Industry (Automated Flight Control System)
...Making Research more of a fun
Putting smiles in the face of Students
Writing your project with precision
AFRICA'S LARGEST ONLINE
PROJECT ARCHIVES
Search Projects materials, seminars, assignments etc.
Get Professional help. Access 10000+ Works,
Over 300 Software Implementations.
...Get It Done In Record Time
DEPARTMENTS
agricultural education proje ... 0
accounting project topics 669
accounting projects topics & m ... 70
agricultural education project ... 13
agricultural engineering proje ... 33
applied biochemistry projects ... 6
banking and finance project to ... 196
biochemistry project topics an ... 2
biology education project topi ... 12
building technology project to ... 3
business administration projec ... 458
business education project top ... 5
business management project to ... 448
chemical engineering 22
chemical pathology projects to ... 6
chemistry project topics and m ... 17
co-operative and rural develop ... 99
co-operative economic and mana ... 99
computer science project topic ... 351
crop science project topics & ... 1
education project topics and m ... 317
education projects topics and ... 36
electrical and electronic proj ... 54
english language and literatur ... 7
estate management project topi ... 23
fashion design technology proj ... 12
fashion design technology proj ... 10
food science project topics an ... 199
geoinformatics and surveying p ... 4
home economics education proje ... 6
igbo language education projec ... 3
industrial chemistry project t ... 15
industrial chemistry projects ... 29
information technology project ... 2
insurance project topics 63
international relation project ... 26
introductory technology educat ... 1
latest mathematics education p ... 10
library and information scienc ... 2
list of chemistry science educ ... 8
list of computer science educa ... 45
list of economics education pr ... 16
list of english language educa ... 29
list of integrated science edu ... 25
marketing project topics 285
mass communication project top ... 272
mathematics projects topics an ... 1
mba projects topics and materi ... 81
mechanical engineering project ... 128
medical laboratory projects to ... 10
medical radiography and radiol ... 8
microbiology projects topics a ... 104
nursing project topics and mat ... 4
nursing projects topics and ma ... 15
nutrition and dietetics projec ... 22
office technology and manageme ... 128
peace studies and conflict res ... 19
philosophy projects topics and ... 7
physical and health education ... 5
physics options project topics 17
physis education project topic ... 2
physology project topics 3
political science project topi ... 6
printing technology projects t ... 2
projects topics and materials ... 2
purchasing and supply project ... 43
quantity surveying project top ... 1
sociology & psychology project ... 4
sociology and anthropology pro ... 17
statistics project topics and ... 52
thesis topics & materials for ... 11
thesis topics materials for fa ... 0
Select Department
Design And Implementation Of A Weather Forecasting Package For Aviation Industry (Automated Flight Control System)
Get the complete project material now!

User Guide before placing order for complete project topics and materials:

It is important that the researcher knows exactly what he is go to do so that I could be done effectively.Make sure you update any research work you purchased on our website. Do not copy word for word. Using our research is legal. Our aim is to provide project topics and materials for easy access to information and to reduce stress of moving from one book stop or library to another in the name of sourcing for one research textbook or research materials. We do not encourage any form of plagiarism. Our aim is to generate research project ideas for students. The contents of the project material provide will help students to generate new ideals. Every researcher must look around him in his immediate environment and beyond to improve the work. To order the below complete project materials, Make payment deposit or cash transfer into any of the following banks:

GTBANK

Account Name: Chi E-Concept Intl, Account Number: 0115939447

Other payment options

We accept cash deposit, cash transfer and Bitcoin.

Click on download to complete your order.Call or Whatsapp +23408063386834

CLICK HERE TO CHAT WITH OUR CUSTOMER SUPPORT TEAM ON WHATSAPP

TABLE OF CONTENTS

CHAPTER ONE

1.0     Introduction

1.1     Statement of the problem

1.2     Purpose of the Study

1.3     Aims and Objectives of the study

  1. Scope/ Delimitation of study

1.5     Limitations/ Constraints

1.6     Definition of Terms

CHAPTER TWO

Literature Review

 

CHAPTER THREE

3.0     Description and Analysis of the existing system

  1. Fact- findings methods used
  2. Organisational structure
  3. Objectives of the existing system

3.4     Input, process, output analyses 

3.5     Information flow diagram

3.6     Problems of the existing system

3.7     Justification of the new system

 

CHAPTER FOUR

4.0     Design of the new system

4.1     Output specification and Design

4.2     Input specification and design

  1. File Design
  2. Procedure chart

4.5     System flowchart

  1. System requirements

 

CHAPTER FIVE

5.0     Implementation

5.1     Program design

5.2     Program flowchart

  1. Pseudocodes
  2. Source Program
  3. Test Data

 

CHAPTER SIX

Documentation

 

CHAPTER SEVEN
  1. Recommendation and Conclusion

REFERENCES

 

ABSTRACT

The  flagrant rate of plane crash in the country toady has given much concern and desire to carry out this “Design and Implementation of a whether fore-casting package for aviation industries”.

          The researcher having been a student for some years now was disturbed by the rate of plane crash and the rate at which lives and properties worth billions of naira were lost in the process.

          Considering the economic hardship is the society today, changes must be made to the patterns of operation of the Aviation industries is our country so that timely and efficient decision-making is taken for efficient utilization of available resources.

          Meteorologists should be provided with sophisticates instruments and equipment for whether observation and recording is order to reduce the rate of unpredictability in plane-crash in our country. The Nigerian Airport Authority Metrological Department and station was chosen as a case study.

          The expected officers were interviewed in this department. The date used for the design were collected through this method and also through observation methods, which were carried out on several occasions of visit to this organisation. It was observed that, without a whether forecasting package, timely and efficient aviation operation would not be achieved.

 

ORGANISATION OF WORK

This project is divided into seven chapters as follows:

Chapter One is the introduction. It contains some sub-heading like the statement of the problem, purpose of the study, the aim and objectives of the study, the scope and delimitations, limitations and constraint and the limitations and constraint and the definitions of term.

Chapter Two deals on the literature review.

Chapter Three talks about the description and analysis of the existing system which includes the facts findings method used, organisational structure, objective of the existing system, the input, process, and the output analysis, the information flow diagram, the problem of the existing system and the justification of the new system.

           Chapter four is about the design if the new system and it involves output specification and design, input specification and design, file design, procedure chart, system flow chart and the system’s requirement.

          Chapter five is the implementation it include program deign, program flow charts. Pseudocodes, the source program and the test program (run).

          Chapter six deals on documentation

          Chapter seven is made up of the recommendation and conclusion

          Finally, references follow after chapter seven.    

 

TABLE OF FIGURE

 

Organisational structure

Information flow diagram

Procedure chart

System flowchart

Program flowcharts.

 

CHAPTER ONE

INTRODUCTION

We are all aware of the diverse and important role Aviation can play in the social and economic way of any nation. Aviation provides effective and timely, national and international transport for people and freight. Transport can be defined as factor of the created importance in all economic activities. It appears true to say that the structure of the transportation network tells the story of the economic development within the areas. Each of the main type of transportation so far developed, namely; road, rail and air transportation operates in different manner and places particular areas and sites and has an advantage at least over one another.

Here, we consider only the air transportation, which involves whether predictions before its operations. Whether is the condition of the atmosphere at a certain place at a specific time. It is therefore a day to day or even an hourly affair. Weather is a local. This means time and place of recording is very essential. On the other hand, climate is the description of the average condition of the atmosphere over a considerable area for along time (at least thirty five years). The study of the climate of an area includes, temperature, rainfall, wind and pressure, amount of sunshine, humidity and visibility.

 

1.1     STATEMENT OF THE PROBLEM

          Meteorologists usually do the observation and recording of weather inputs. Due to the complex nature of these recording, they encounter some problems during their work. The problem are:-

1.       Lack of adequate instruments and equipment for taking accurate readings and recordings.

2.       Incorrect description of weather inputs by these meteorologists which leads to wrong forecasting.    

3.       Wrong use of database and organisation.

 

1.2     PURPOSE OF STUDY

          The need for weather information for the safe generation of aircraft was first recognized on the very day the Wright Brothers (Willbur and Orill) made a historic flight demonstration on 17 December, 1903. during the demonstration sudden strong guest of wind damaged their aircraft. Other flight made during the early year up Aviation indicated that weather information and forecasting played a major role in Aviation operation. It was also discovered that flights were impossible under poor visibility and lows clouds. This situation is still witnessed till date. So, the purpose of this study is to receive meteorologists from the cumbersome nature of their, job, which is hourly observation and recording. It will also reduce the mistake they make in their description of weather condition, which will lead to timely and efficient weather forecasting. 

 

1.3     AIMS AND OBJECTIVES

          Owing to the problem of inadequate instruments and equipment for taking accurate weather inputs that lead to wrong forecasting and wrong use of database.

          The aim and objectives of this project is to design a weather forecasting package that will help the Aviation industries to weather forecast effectively.

 

1.4     SCOPE/DELIMITATION  

          This defines what the precise limits of the possible area are: in this study the scope or delimitation will be meteorological department and weather station of the Enugu State Airport Authority Emene. The methods of weather observation, recording and instruments used will be considered. The reasons for lack of weather forecasters in the organisation will also be taken in account.

 

1.5     LIMITATION/CONSTRAINTS

          These are those conditions beyond the control of this project. The major limitation to this study is time factor. Others includes money or financial consideration, accurate information and appropriate respondents.

 

1.6     DEFINITION OF TERMS

Air-Craft:  This is an automated flying machine

Air-Port:    This is a public flying ground use by airliners usually with offices for customers and immigrations.

Computer: This is an electronic device capable of accepting data through the input medium, processing the data and giving at out the result is the output section. it at well store data (processed/raw data).

Forecast:    This means predicting before the outcome of an event.

GMT:         This means Greenwich Mean Time. It is the universally accepted time used in Aviation operation by the world meteorological observation.

Meteorology:       This is the specific study of the earth’s atmosphere and its changes.

Nosig:         This means that there is not likely to be any significant change is the weather within the next, two (2) hours.



Get the complete project material now!
CUSTOMER'S REVIEW
blessing
I so much appreciate, keep the good work on.
excellent customer support
I am happy, my project was great.
ohikhueme sylvanus
Please i need theses on Leadership and good governence in nigeria: Imperative of security in nigeria, please i would glad if my message is answered immediatly. Thanks
Tony
This site have all scholars needs for their project, i can testify to that.
Rita
A site with great relief to scholars.
1 - 5 of 96 Reviews
PROJECT INFO

UID : 11621 PRICE : 5,000.00

Download Now
Related Topics
design and implementation of an on-line flight reservation system (case study of airk airways or any other airline)
design and implementation of a sales forecasting system
design and implementation of automated library management system
design and implementation of automated motor vehicle driving licensing system
design and implementation of an automated internal audit accounting system(case study of skylinks lafia)
design and implementation of a software package for legal practitioner
design and implementation of internet security package for a cyber café
design and implementation of an automated motor vehicle driver’s licensing system. (a case study of enugu motor license office, enugu state; abakpa nike)
design and implementation of real time operating system (rtos) based control and safety monitoring system
design and implementation of a computerized stock control system


Payment Name Phone Number
Email Address Payment Date
Gender Payment method